Thursday, September 17, 2009
The Reno's
I feel like I'm at a stand still, I started the mudding and taping tonight but I still have so much to do. We have to take the tub out, redo the Red Guard, two coats, then put the tub in and on a layer of thinset. Plumb the tub, apply the DensSheild to the front of the surround. Thinset and Red Guard that. Then do the mudding and taping on that side of the room. Build the Shower wall, and mud and tape that. Tile the entire bathroom, tub surround and all, Seal the tile, sand the whole room (Which is the worst part.) Final coat of mud and sand again, primer, and Paint. Then Build the Rear shower wall, Finish Plumbing the shower, Apply DensSheild, pour mortar for the floor, hook up the drain, thinset and Red Guard the shower walls. Tile the shower, and install the light fixtures. Install the glass doors, Seal all the tile, and finally take a bath. Wow, I wish I never wrote that out, now I'm really depressed, we still have a lot of work to do baby, sorry.